Flotron delivered a design-build three 800-ton chiller replacement project at the Ronald Reagan Building and International Trade Center in Washington DC. The design package included full mechanical, electrical and structural engineering documents.
The Federal Triangle, Washington DC
U.S. General Services Administration – GSA

Flotron delivered a design-build three 800-ton chiller replacement project at the Ronald Reagan Building and International Trade Center in Washington DC. The design package included full mechanical, electrical and structural engineering documents.

As part of an energy savings project, Flo-Tron performed design-build services to upgrade and modernize the HVAC control systems across four buildings, replace the central heating plant in the St. Cecilia daycare center, and install dedicated HVAC systems for the cafe.

FloTron completed a Steam System interconnect project at the Aberdeen Proving Grounds on a design-build basis. The final design documents included full mechanical, electrical, and structural engineering. The final project was necessary to replace an obsolete portion of a 350 PSI high-pressure steam loop on the eastern half of the base. The existing loop was…
Need emergency service to get your system back up and running? Want to develop a maintenance plan? Need to have your HVAC or plumbing system evaluated and inspected? Contact us to schedule an appointment!